Litherland High School - Science Block
Client: Sefton Borough Council
Installation Details:
This ambitious curtain walling scheme using the Sheerframe 2001 heavy-duty system, involved the creation of a full building envelope - curtain walling spanning three storeys in height, on all four elevations.The exceptional wind-loading performance provided by Sheerframe was crucial to the project's success, as were the in-built thermal expansion joints, which enabled PVC to be used effectiviely on such a scale.
Crystal supplied and fitted all windows and frames for the development.
Crystal's expertise and production flexibility is evident on this project.

